Design and Construction Manual
All design and construction projects related to water, sewer, and reclaimed water are subject to all requirements as listed in the Water, Sewer, and Reclaimed Water Design and Construction Manual.
Water Utilities - Construction Manuals
Section UL
 Notification to Developers 
 Memorandum for Water Design Manual Revision 3 
 Preface 
 Table of Contents - Overall 
 Section 1 - General Guidelines 
 Section 2 - Potable Water Systems revised 12/10
 Section 3 - Sewer Systems revised 12/10
 Section 4 - Reclaimed Water Systems revised 12/10
 Required Notes revised 12/10
 Revisions revised 12/10
 Appendix revised 12/10
Water Utilities - Construction Manuals - Standard Drawings - Water
Section UL
 W-00 Table of Contents - Standard Drawings Water 
 W-01 Fire Hydrant
 W-02 Standard Blow-Off
 W-03 2" Air Release Valves - revised 12/10
 W-04 3/4" and 1" Water Service
 W-05 Standard 1 1/2" and 2" Meter Service
 W-06 Water Meter Service Abandonment
 W-07 Standard Hot-Tap Connection (3" and larger)
 W-08 Water Sampling Station - revised 12/10
 W-09 Standard Fire Flow Master Meter - revised 12/10
 W-10 3" and 4" Compound Meter for Commercial and Multi-Family Service - revised 12/10
 W-11 3" and 4" Turbo-Meter for Irrigation Service
 W-12 Reduced Pressure Principle Assembly (2" and smaller) - revised 12/10
 W-13 Reduced Pressure Principle Assembly (3" and larger)
 W-14 Double Check-Detector Check Assembly
 W-15 Check Valve
 W-16 Relief Valve
 W-17 Standard Pressure Reducing Valve Connection - revised 12/10
 W-18 Valve Support - revised 12/10
 W-19 Standard Vault
 W-20 Vault Frame and Cover
 W-21 Standard Post Indicator Valve Installation with Fire Department Connection - revised 12/10
 W-22 Line Valve Installation
 W-23 Valve Box and Covers - revised 12/10
 W-24 Valve Stem Extension
 W-25 Steel Casing Detail - revised 12/10
 W-26 Gated Outlet on Water Main for Future Use
 W-27 Typical Thrust Block
 W-28 Water Line Abandonment
 W-29 Reduced Pressure-Detector Check
Water Utilities - Construction Manuals - Standard Drawings - Sewer
Section UL
 S-0 Table of Contents - Standard Drawings Sewer 
 S-1 Design Criteria for Separation of Water and Sewer Mains - revised 12/10
 S-1a Design Criteria for Separation of Water and Sewer Mains - revised 12/10
 S-2 Plastic Pipe Details
 S-3 House Connection (Sewer Lateral)
 S-4 Sewage Backwater Valve Assembly
 S-5 Manhole - 4' Diameter (For 21" max. dia. pipe) - revised 12/10
 S-6 Manhole - 5' Diameter (For 24" through 42" dia. pipe) - revised 12/10
 S-7 Inspection Manhole
 S-8 Steel Encasement Detail - revised 12/10
Water Utilities - Construction Manuals - Standard Drawings - Reclaimed Water
Section UL
 RW-00 Table of Contents - Standard Drawings Reclaimed Water 
 RW-01 Design Criteria for Separation of Water, Sewer and Reclaimed Water Mains - revised 12/10
 RW-01a Design Criteria for Separation of Water, Sewer and Reclaimed Water Mains - revised 12/10
 RW-02 Standard 4" Blow-Off
 RW-03 2" Air Release Valves - revised 12/10
 RW-04 3/4" and 1" Irrigation Service - revised 12/10
 RW-05 Standard 1 1/2" and 2" Irrigation Service
 RW-06 3" and 4" Turbo-Meter for Irrigation Service - revised 12/10
 RW-07 Reduced Pressure Principle Assembly (2" and smaller) - revised 12/10
 RW-08 Reduced Pressure Principle Assembly (3" and larger)
 RW-09 Check Valve
 RW-10 Relief Valve
 RW-11 Pressure Reducing Valve
 RW-12 Valve Support - revised 12/10
 RW-13 Standard Vault
 RW-14 Vault Frame and Cover
 RW-15 Valve Box and Covers
 RW-16 Stainless Steel Valve Stem Extensions
 RW-17 Standard Hot-Tap Connection (3" and larger)
 RW-18 Line Valve Installation
 RW-19 Gated Outlet on Reclaimed Water Main for Future Use
 RW-20 Typical Thrust Block
 RW-21 Steel Casing Detail - revised 12/10
 RW-21 Steel Casing Detail - revised 12/10
 RW-22 Reclaimed Water Line Abandonment
 RW-23 Reclaimed Water Meter Service Abandonment