Operations & Maintenance Plan (O&M)

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Drought-proof landscapingImplementation of a long term Operation and Maintenance Plan (O&M) is required as part of the final engineering phase of a Priority Development Project (PDP). The San Diego RWQCB Municipal Permit requires the City to annually verify that all treatment and flow-control facilities are correctly installed and adequately maintained.

To demonstrate compliance with O&M requirements, all PDPs are required to prepare an O&M Plan that identifies, at a minimum, the following:

  • Project Description
  • Owner's Name and Contact Information
  • Designated Responsible Party
  • Permanent BMPs
  • Education/Training
  • BMP Maintenance
  • BMP Inspection
  • Inspection & Maintenance Records
  • Maintenance Estimate
  • Supporting Exhibits
  • Executing a Storm Water Facilities Maintenance Agreement (SWFMA) or acceptable alternate maintenance mechanism

The City also verifies the ongoing function of storm water management features that are not treatment or flow control facilities, which left unmaintained, would cause BMP failure.

Owners will be contacted by City Staff on an annual basis to provide confirmation of BMP maintenance. Annual maintenance verification may include a site inspection by City Code Enforcement Staff.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer