Standard Storm Water Facility Maintenance Agreement (SWFMA)

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Drought-proof landscapingThe City Standard Storm Water Facilities Maintenance Agreement with Access Rights and Covenants (SWFMA) is a recorded agreement for the maintenance and repair of storm water management facilities, entered into between the Owner and the City of Oceanside. The Agreement binds the Owner, the Successors and runs with the property.

Complete the agreement with all the required information, project name, project file number, and all notarized signatures by the title owners. Attach required exhibit "A" (Property Legal Description), and Exhibit "B" ( showing the location and description of the BMPs located in the project site.

Access Rights

The SWFMA provides the City with access rights for the purpose of annual inspections, as required by the Municipal Permit and to possibly perform BMP maintenance, should the owner default.

Security

The SWFMA includes a non-refundable security to assure faithful performance of the obligations of the agreement. The security is based upon a Storm Water Facilities BMP Maintenance Estimate prepared by a Registered Civil Engineer. The security amount is based upon annual BMP maintenance costs multiplied by a factor of ten (10); not to exceed $25,000.00.

Note: There is no mechanism to release the SWFMA security. An owner conveying interest in the property to another party should consider recovering the capital associated with the non-refundable security as part of negotiating the transaction.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer